Hoist install @ Lucky Peak Dam.
Author:Lisa Rouse
Powerhouse Bridge Crane Rehab, Fort Randall Dam, South Dakota
Click to View Full Size Images
Aluminum Plate Staging Table
WEMCO was awarded the contract to design and manufacture a fully automated heat treat furnace staging table for Kaiser Aluminum. The table is capable of aligning two large aluminum plates parallel on a random center line with 1/4″ accuracy. The machine is equipped with a positioning system capable of squaring and transferring plates to the …
Continue reading Aluminum Plate Staging Table